English translation for "water power resources"
|
- 水力资源
Related Translations:
resource: n.1.〔pl.〕资源;物力,财力。2.方法,手段;机智,智谋,才略。3.消遣,娱乐。短语和例子natural resources 自然资源。 hidden resources 地下资源。 Flight was his only resource. 他只有逃走一法。 Reading is a great resource in illness. 读书是病中极好消遣。 He
- Example Sentences:
| 1. | The developing ways in water power resource could be by solely capital , joint - stock , corporation , or through contract , rent , shares , bit for , vendue etc to gain the managing right for completed hydropower stations , also shares ( property right ) could be transferred and succeeded 允许独资、股份、合作等方式开发水电,通过承包、租赁、股份、招标拍卖等形式取得已建电站经营权,允许其股权(产权)转让、继承。 | | 2. | Water power resource is the most in the coastal area of fujian province , theory contain is 260 , 000 kw , 174 , 000 kw of which is available for development , among them 155 , 700 kw are able to set up single hydropower station with 100 kw or more , the annual amount of generate electric power is 0 . 652 billion kwh 水力资源居福建省沿海县区之最,理论蕴藏量达26万千瓦,可开发的装机容量17 . 4万千瓦,其中单站装机100千瓦以上约15 . 57万千瓦,年均发电6 . 52亿千瓦时。 | | 3. | By incorporating the power sources location and load prediction results in the energy utilizing proposal , a balance for the power volume needed by 3 counties in the area in three " five - year plans " period is also made , the result of which indicates that , it can meet the power demand required by the social - economic development in the region in next three " five - year plans " if the water power resources are rationally planned and developed and then a comprehensive energy utilizing proposal by combining solar and winding energy together 并结合区内电源点分布和负荷预测结果,进行了各县三个五年计划期间的电力电量平衡。得到了相应的结论。基于对风能、光能和水能资源开发各自特点的分析,文中进一步对多能互补系统进行了较深入的研究,明确了在阿里地区特定的自然条件下,采用风光互补抽水蓄能开发方式的合理性及可行性。 | | 4. | Abstract : having conducted investigation into problems related to the macro development of exploitation of pearl river valley ' s water power resources , the authors discuss water power resources of the valley and conditions and level of their exploitation and probe into the strategic deployment for their exploitation in the mid 21 century according to the economic development , electric power planning and also possibilities of regional network construction of related provinces 文摘:对珠江流域水能资源开发利用宏观发展有关问题进行了研究,着重论述本流域水能资源及其开发利用条件和开发程度,根据各省(区)经济发展、电力规划和区域电网结构建设的可能性,探讨21世纪前期,重点是21世纪前20年开发的战略部署。 |
- Similar Words:
- "water power map" English translation, "water power plant" English translation, "water power potential" English translation, "water power project" English translation, "water power resource" English translation, "water power scheme" English translation, "water power set" English translation, "water power site" English translation, "water power station" English translation, "water power station in river channel" English translation
|
|
|